ACDC carry out statutory, 12 monthly inspections of your train jacks in accordance with the Lifting Operations & Lifting Equipment Regulations (L.O.L.E.R) 1998, BS7121-1:2016 and PUWER.
A Preventative Maintenance contract from ACDC Cranes will not only ensure that your asset is working safely, efficiently and effectively, but can also improve the life span of your equipment and in turn improve site safety and overall productivity.
Legal Information Key Notes; are you aware that you are responsible to have the following inspections in place: | ||
---|---|---|
1 | Pre-Use Checks | Pre-use checks should be carried out at the start of each shift. Required under LOLER 1998 & BS7121-2-1:2012 |
2 | LOLER 1998 Inspection - Cranes | Report of thorough inspection; LOLER 1998 regulation 9 requires cranes and supporting structures to be examined in the following circumstances: |
Periodically whilst in service, at maximum intervals of 6 months for cranes that lift people and 12 months for cranes that lift goods only, LOLER regulation 9(3)(a)(i) and (ii) | ||
3 | LOLER 1998 Inspection - An accessory for lifting i.e. chains / slings | Report of thorough inspection; periodically whilst in service, at maximum intervals of 6 months for, LOLER regulation 9(3)(a)(i) |
4 | In-Service Inspections | In-service inspections and maintenance are carried out to ensure that components are repaired or replaced before they deteriorate to a point at which they could become unsafe. Planned preventative maintenance should be carried out in accordance with the manufacturer's instructions in compliance with LOLER 1998 section 9, 330 - 352, BS7121-2-1 2012 section 6.3 and PUWER section 5 |