ACDC Cranes offer services to do load testing an any lifting appliance using calibrated test weights and load cells to comply with current statutory requirements.
A load test is performed to verify that a specific lifting appliance / anchor point will safely perform all of its functions in accordance with manufactures guidance.
A Proof Load Test is required upon the installation of any lifting equipment before the item is brought into service.
There may be other times in the equipment’s life when a Proof Load Test is required, examples include: